Final Preinstallation Checklist
Complete the following checklist to ensure that the network requirements are met.
For information about IP addresses, see Customer Site Network Requirements.
| 
 Network Specification Considerations  | 
 Yes, No, or N/A  | 
 Comment  | 
|---|---|---|
| 
 Did you complete the networking worksheet, which is included in Networking Checklist?  | 
||
| 
 Have you received the site-specific installation template from your Oracle technical representative?  | 
||
| 
 Did you review the installation template and consult with your Oracle technical representative regarding any site-specific changes, if any?  | 
||
| 
 Did you verify that IP addresses in the installation template are currently not in use?  | 
||
| 
 Have you performed the required configuration within your network infrastructure to allow the Compute Cloud@Customer to use the IP addresses specified in the template?  | 
||
| 
 Have you registered IP addresses in the installation template with DNS?  | 
||
| 
 Did you run the required network cables from your network equipment to the location where the Compute Cloud@Customer will be installed?  | 
||
| 
 Did you label the network cables that will connect to the Compute Cloud@Customer?  | 
What's Next?
Prepare your OCI tenancy. See Preparing Your Tenancy.