Final Preinstallation Checklist

Complete the following checklist to ensure that the network requirements are met.

For information about IP addresses, see Customer Site Network Requirements.

Network Specification Considerations

Yes, No, or N/A

Comment

Did you complete the networking worksheet, which is included in Networking Checklist?

Have you received the site-specific installation template from your Oracle technical representative?

Did you review the installation template and consult with your Oracle technical representative regarding any site-specific changes, if any?

Did you verify that IP addresses in the installation template are currently not in use?

Have you performed the required configuration within your network infrastructure to allow the Compute Cloud@Customer to use the IP addresses specified in the template?

Have you registered IP addresses in the installation template with DNS?

Did you run the required network cables from your network equipment to the location where the Compute Cloud@Customer will be installed?

Did you label the network cables that will connect to the Compute Cloud@Customer?

What's Next?

Prepare your OCI tenancy. See Preparing Your Tenancy.